INSTALLATION
 


INSTALLATION

OUR ON-THE-SPOT CHECK

Every wall is different. In order to define the best type of intervention necessary for solving the problem, ELO makes an on-the-spot check, during which experts can determine the wall's natural electric field characteristics and any presence of salts.

Only after this on-the-spot check and the analyses of the data gathered during it will ELO be able to offer the specific solution suitable for that particular case.

INSTALLATION OF THE ELO SYSTEM

After evaluating the specific case carefully, our experts establish the position of the two tracks inside which the positive electrode (track to be made above the highest level of moisture) and the negative electrode (track to be performed at the base of the wall) must be located.

The ELO System electrodes are then laid inside these tracks.
Subsequently, the tracks are closed with cement mortar to which special additives are added to ensure maximum conductivity.
The electrodes are then connected to the ELO Unit, which imposes an electric field having a potential higher than and opposite to the natural one. The ELO Unit is programmable and is fitted with a graphic display that shows the following information: applied potential, current delivered to the system and days of operation. In case of anomalies, the display signals the type of anomaly together with its date and time. Furthermore, the control unit reads and records the delivered current, which represents the index of average moisture in walls, on a daily basis.

FINAL SYSTEM TEST

Our technicians perform the final test upon completion of the system installation. Several electrical measurements are taken for this purpose in various zones of the system (at least one point on each wall) and in any points that the customer's site engineer may request.